Domain: Office Space

  • Global Fertility

    April 7, 2016
    Denair carried out the HVAC part of this sizable project. Denair performed demolition of the existing system first and provided…
  • Jack Resnick & Sons

    April 7, 2016
    This renovation project required relocation of FCU units and existing condensate and condenser water S7R piping. Denair HVAC, also, produced…
  • Macklowe Management

    April 7, 2016
    The project was done in the shortest time and involved provision and installation of new VAV boxes, supply and return…
  • Cohen Brothers

    April 7, 2016
    Two floors were renovated in the building. Denair carried out HVAC part of the project. We furnished and installed new…
  • Moinian Group

    April 7, 2016
    Moinian Group building was a small project, which involved the following HVAC works. As mechanical contractor, Denair HVAC NYC supplied and…
  • Open Society Foundations

    April 7, 2016
    The project involved demolition of the existing equipment and installation of new. As mechanical contractor Denair HVAC supplied and installed…
  • IMG 5th Floor Renovation

    April 7, 2016
    Renovation of the 5th floor in IMG building required demolition as specified and installation of new exhaust fans, radiators, ductwork…
  • Centurion Realty

    April 7, 2016
    The project was accomplished in accordance with project drawing and specification. Denair furnished and installed ductwork, diffusers, grilles and dampers,…
  • Vibrant Media Inc.

    April 7, 2016
    For this project, Denair HVAC NYC fabricated and assembled required ductworks with all associated accessories, supplied and congregated volume and motorized dampers…