LIM College
216 East 45th Street, New York, NY, United States
- Project: 116
- Year: 2015
- Category: Education
Lim College project required demolition of the existing equipment and installation of new: air conditioning units, electric reheat coils, exhaust fans, filter housings, etc. Ductwork was fabricated in our sheet metal shop in New York and installed with all associated accessories. Condensate piping and condenser water S&R piping was relocated. Thermostats, control wiring, detectors were installed as specified. Upon completion of the job, we carried out air balance and provided certified report along with mechanical shop drawings and as-built drawings.
Quad Cinema Renovations
34 West 13th Street, New York, NY, United States
- Project: 115
- Year: 2015
- Category: Theatre
This large project was successfully completed by Denair HVAC NYC at the most satisfaction of the client. The mechanical works involved: provision and installation of air handling and condensing AC units, cabinet unit heaters, EBH, humidifiers, exhaust fans, supply fans. Having our own sheet metal shop we fabricated ductwork, and installed including outdoor ductwork, acoustic panels, duct silencers, volume, able operated, fire/smoke and motorized dampers. Denair HVAC provided all necessary piping, including hot water, refrigerant and condensate piping with condensate pump. Humidistats, humidity sensors, air pressure switches, thermostats, control wiring leak and smoke detectors were installed in accordance with the project specifications.
Medical Office 175 East 96th Street, New York, NY Service Contract
175 East 96th Street, New York, NY, United States
- Project: 114
- Year: 2015
- Category: Medical Facilities
This project was accomplished by Denair HVAC NYC in the shortest time. We furnished and installed two air curtains with door switches, exhaust fans, supply and returns grilles, diffusers as well as duct heaters, thermostats and drip pan with leak detectors. We also produced and installed stainless steel ductwork with all associated accessories and volume and draft back dampers. At the end of the project we performed system start-up and we kept the equipment under our maintenance for another year to make sure that HVAC system is working at peak performance efficiently.
Centurion Realty
415 Broadway, New York, NY, United States
- Project: 111
- Year: 2015
- Category: Office space
The project was accomplished in accordance with project drawing and specification. Denair furnished and installed ductwork, diffusers, grilles and dampers, provided mechanical installation of all piping including condensate line, submitted shop drawings and as-built drawings and carried out air balancing upon completion providing certified report.
Vibrant Media Inc.
162 Fifth Avenue, New York, NY, United States
- Project: 110
- Year: 2015
- Category: Office space
For this project, Denair HVAC NYC fabricated and assembled required ductworks with all associated accessories, supplied and congregated volume and motorized dampers as well exhaust fans, louvers, diffusers, supply and return grills. Air balancing and drawing were provided to the client in the end of the project.
Tuxedo Shop
59-20 Myrtle Avenue, Queens, NY, United States
- Project: 108
- Year: 2015
- Category: Medical Facilities
59-20 Myrtle Avenue
In the project, Denair HVAC NYC furnished and installed 5-ton AC units, exhaust fans, supply and return grills, and diffusers. We produced ductwork and assembled with associated accessories, including volume and motorized dampers. Furnished and installed actuators, thermostats and associated wiring.
Barry’s Boot camp
300 East 64th Street, New York, NY, United States
- Project: 107
- Year: 2015
- Category: Fitness Center
HVAC part of this project involved: supply and installation of AC units, hot water coils, unit heater, exhaust fan, supply and return grilles, and louvers. Denair produced and assemble ductwork and access doors. Congregated thermostats and control wiring, leak and smoke detectors. We arranged insulation of the existing piping and rerouted existing ductwork. Finally, we performed air balancing providing certified report. All supporting documents as well as shop and as-built drawings were provided to the client.
Fox & Jane
277 E 10th St, New York, NY, United States
- Project: 106
- Year: 2015
- Category: Retail Store
Denair HVAC NYC supplied and installed 24,000 BTU ductless split system providing refrigerant lines, condensate line with condensate pump and control wiring. We performed system start-up to ensure the equipment is working properly.
Isabella Geriatric Center, stage 2
515 Audubon Ave, New York, NY, United States
- Project: 105
- Year: 2015
- Category: Retail Store
(kitchen room)
In this project Denair HVAC NYC performed wall penetration, furnished and installed through inline exhaust fan, new ductwork with associated grills.
IMG 12th Floor Renovation
304 Park Avenue South, New York, NY, United States
- Project: 104
- Year: 2015
- Category: Office space
This renovation project required demolition of a part of the existing equipment, relocation and installation of new equipment. Denair HAVC NYC arranged relocation of existing AC units, diffusers and thermostats. Provided new paintable ductwork with associated accessories, new volume dampers, new piping including refrigerant and condensate. Furnished and installed new thermostats control wiring. Upon completion, Denair carried out air balancing and provided certified report. Mechanical shop and as-built drawing were provided to the client.