HVAC part of this project involved: supply and installation of AC units, hot water coils, unit heater, exhaust fan, supply and return grilles, and louvers. Denair produced and assemble ductwork and access doors. Congregated thermostats and control wiring, leak and smoke detectors. We arranged insulation of the existing piping and rerouted existing ductwork. Finally, we performed air balancing providing certified report. All supporting documents as well as shop and as-built drawings were provided to the client.