During this project Denair HVAC NYC provided all necessary mechanical equipment and installed 5 ton condensing unit, 5 ton air handler, steam coil cut into supply air ductwork, ductwork connections, branches with grills, provided refrigeration piping and support as well as condensate drain piping, installed thermostats and drip pan with leak detector.