Lim College project required demolition of the existing equipment and installation of new: air conditioning units, electric reheat coils, exhaust fans, filter housings, etc. Ductwork was fabricated in our sheet metal shop in New York and installed with all associated accessories. Condensate piping and condenser water S&R piping was relocated. Thermostats, control wiring, detectors were installed as specified. Upon completion of the job, we carried out air balance and provided certified report along with mechanical shop drawings and as-built drawings.