Grand Central Plaza
April 7, 2016Removed existing ductwork, branches, grills and registers and installed new as per client’s specifications. F/I volume dampers, temperature controls, gills,…HAP Investments
April 7, 2016Denair HVAC NYC removed performed demolition of the existing equipment, inspected the site and carried out value engineering research. Based…1001 6th Avenue 10th floor
April 7, 2016