Domain: Retail Store

  • April 7, 2016
    Denair executed the full scope of mechanical work in this project, which involved: supplying and installation of ducted ceiling concealed…
  • April 7, 2016
    Denair HVAC NYC fabricated and installed all new ductwork in accordance with project requirements. Supplied and installed all required dampers,…
  • April 7, 2016
    The project involved fabrication and installation of new ductwork and motorized dampers with actuators and control wiring. Furthermore, Denair HVAC…
  • April 7, 2016
    Denair HVAC NYC  carried out inspection of the existing equipment and provided maintenance. We replaced a couple of AC units…
  • April 7, 2016
    Small HVAC work was done to reclaim Freon 22 from existing mechanical unit.
  • April 7, 2016
    Three floors were renovated in the building. HVAC part of the renovation included: demolition of a part of the existing…
  • April 7, 2016
    Small HVAC project on Washington street involved supply and installation of exhaust fan, louver and ductwork with back draft damper.
  • April 7, 2016
    Denair HVAC NYC supplied and installed 24,000 BTU ductless split system providing refrigerant lines, condensate line with condensate pump and…
  • April 7, 2016
    (kitchen room) In this project Denair HVAC NYC performed wall penetration, furnished and installed through inline exhaust fan, new ductwork…
  • April 7, 2016
    (bathroom) In this project, Denair HVAC NYC removed existing grills, fire dampers and ductworks. Fabricated and installed new ductworks with…